EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
KMYARV12
-
Listing for Category : landing gear
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (116)
Skills Dev
- (5)
Research
Workshop
- (46)
Empennage
- (26)
Fuselage
- (34)
Firewall
Tail Feathers
- (2)
Wings
Controls
- (1)
Avionics
- (1)
-
An Airventure, All...
Lighting
Instrument Panel
Landing Gear
- (1)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Howard Kaney
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
552.8
Total Flight Time:
Start/Last Date:
Aug 17, 2020 - Jun 10, 2022
Engine:
Rotax 912iS Sport
Panel:
Dynon Skyview dual screen
Friendly URL:
https://eaabuilderslog.org?s=KMYARV12
Home or Last Project Picture
Aug 31, 2021
All of August, A Slow Process
- (75 hours)
Category: Landing Gear
Our work is a grinding halt. It took Larry and I (Harsh Patel) 2.5 hours to do 1 step. Which riveting a small wire attack bracket to hold a bunch of wires in. It was in a tough spot and finding the rivet and part itself took most of the time.
A similar story is present for all other sections. Putting the wiring and other small details in takes much more time than anticipated. Furthermore back ordered parts delay certain sections, which delay later sections and the problem expedites itself.
Besides the plane, the group went to the Balloon rally at the Airport, students practiced flying on a flight simulator, and cleaned up the hangar (there was nothing to do because of back ordered parts).
The engine
Rudder cables, they were inserted and removed many laborious times
fiberglass tailcone was a pain
cutting the slit for the elevator, took very long
IMG_20210803_205430287.jpg
sideways fuselage
hartford balloon rally
wiring
organization for the d - pin connectors in the trim motor
students working
new student doing practice part
IMG_20210808_184925382.jpg
IMG_20210808_184937243.jpg
IMG_20210808_193718390.jpg
IMG_20210808_193740063.jpg
stormy weather outside, 30 mph gusts
IMG_20210818_105116196_BURST000_COVER_TOP.jpg
IMG_20210818_105125544.jpg
IMG_20210818_105146588.jpg
rear of the fuselage looking at canopy
canopy rough installed
IMG_20210822_190038454.jpg
flight simulator
fuselage on ground so its easier to install canopy
IMG_20210823_210605386.jpg
IMG_20210823_210637532.jpg
IMG_20210823_210645422.jpg
freshly washed plane
students and mentor organizing tools
IMG_20210829_182128592_HDR.jpg
IMG_20210829_182139213_HDR.jpg
IMG_20210829_182147330.jpg
tail and wings waiting for months... final assembly draws near
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.